Biological nutrient removal using intermittent aeration in a hybrid moving bed biofilm reactor
2012
The paper presents an experimental study on a lab scale pilot plant in a Hybrid Moving Bed Biofilm Reactor. The pilot plant was fed with synthetic wastewater and was in operation considering two different operating conditions: continuous aeration and intermittent aeration. Both continuous and intermittent aeration were monitored and compared in order to seek the best conditions for carbon and nitrogen removal. At the beginning of the experimentation, an initial period of about 90 days was considered during which the pilot plant worked in bench scale configuration for allowing the formation of biofilm on the carriers. Once the biofilm growth was accomplished, the pilot plant worked for a fir…
Sequential batch membrane bio-reactor for wastewater treatment: The effect of increased salinity
2016
In this work, a sequential batch membrane bioreactor pilot plant is investigated to analyze the effect of a gradual increase in salinity on carbon and nutrient removal, membrane fouling and biomass kinetic parameters. The salinity was increased by 2 g NaCl L-1 per week up to 10 g NaCl L-1. The total COD removal efficiency was quite high (93%) throughout the experiment. A gradual biomass acclimation to the salinity level was observed during the experiment, highlighting the good recovery capabilities of the system. Nitrification was also influenced by the increase in salinity, with a slight decrease in nitrification efficiency (the lowest value was obtained at 10 g NaCl L-1 due to lower nitri…